Club de Libro - Fortuny Building (SAPE)
- Category
The project stands out on account of its arborescent galvanized steel structure that supports the building on both sides. The auditorium is located on the ground floor and the other open floors are used for offices. Orona solutions installed: 3 lifts (1 Electric lift 800 kg at 1 m/s, 4 stops, speed control VVVF + 2 Electric lifts 800 kg, 1 m/s, 6 stops, speed control VVVF.)